“We just hang them and go. There are no wires to pull.”
John Streicher, Electrical Engineer, University of Northern Iowa
The Problem:
The University of Northern Iowa is a top rated institution with an ever-evolving campus where renovations and technology upgrades can be seen throughout the 15-building campus. Unfortunately, the university’s hard-wire clock system was causing unnecessary delays for a number of the university’s projects. “Every time a clock was added or replaced, it required complicated wiring from the closest existing clock to the new clock,” explained John Streicher, an electrical engineer for the school.
To make matters worse, the out-of-sync clocks were also causing major delays for students and faculty. “Many students have back-to- back classes on opposite ends of the college campus,” said the university’s public relations director. “When the clocks are out of sync, classes don’t start or end on time and students arrive late.”
The Solution:
After a thorough investigation of all the options available, the university installed Primex’s CommandPoint system because of its low maintenance costs, guaranteed accuracy, and easy installation. “We just hang them [the clocks] and go,” Steicher said. “There are no wires to pull.”
Results: